The UK grid-injection biomethane sector in numbers, which public registers our plant list is built from, and every installation we leave out, with its reason.
Indicative sector scale: about £2.2bn at the one completed reference sale, a screening figure, not a valuation.
Of this, about 119 GWh a year (4 plants) sits at companies in administration or liquidation. It stays in the totals while the plants operate.
The tracked fleet's ≈5,448.719 GWh a year of register-based and default estimated output, multiplied by the £0.40m per GWh a year screening reference point: the completed Aug 2024 FGEN to Future Biogas sale of control, a carrying-value mark. The completed Oct 2026 buy-out of the rest of the same portfolio by the controlling owner implies ≈£0.64m; it is shown as context and not used. The reference rests on one portfolio.
It is an order-of-magnitude sense-check across the 133 plants that carry an output estimate (nameplate output × the screening band), not a valuation. The platform's own bottom-up valuation, which values each plant over its remaining life, gives a central figure at or below the low end of this range. The gap is the difference between a price paid for a young portfolio and a remaining-life value for an older fleet; see the Valuation page.
No single UK register lists every biomethane plant. Our fleet is the reconciled union of the Green Gas Certification Scheme (the operating, certificate-selling fleet), the Ofgem NDRHI accreditation register (the subsidy and cliff record), and Companies House and the Environment Agency for entity and permit checks.
The Ofgem NDRHI register lists subsidy accreditations, not physical plants. One plant can hold several accreditations; some accreditations were provisional and never built; some belong to sites that have since ceased. We resolve each Ofgem entry to a real, operating asset, or we set it aside with a reason. The exclusions list names the 65 Ofgem installations currently held out of the operating-asset analysis, in full.
Conversely, 34 of our 136 plants never appear on NDRHI at all: the newest plants accredited under the successor GGSS scheme (NDRHI closed to new entrants), and industrial or water-utility injectors that earned their income from transport fuel rather than the heat subsidy. That is why we do not treat any one register as the definitive list, and why we document every judgement call.
How much of the known universe we match, and how complete each field is across the fleet.
9 duplicates retired · 19 non-grid plants scoped out. Universe: 175 biomethane accreditations on the Ofgem NDRHI register (as of 24 Jul 2026).
Ofgem NDRHI installations reviewed: 175. 101 matched to a plant in the fleet, 65 held out, 6 reconciled in, 3 merged into an existing asset.
Register rows for ceased or non-operational sites, not live producing assets. A company name marked "in administration" is the register's label for the entity, not a statement about the plant. Not counted in our fleet.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Adnams Bio Energy Limited (in administration)Ceased; entered administration 2017. Not an operating asset. | 525,600 m³ a year | 30 Sept 2014 |
| Fairfield Bio EnergyCompanies House DISSOLVED (Fairfield Bio Energy Ltd, 07531319). Not in GGCS. Plant defunct; excluded. | 1,681,920 m³ a year | 30 Jan 2015 |
| Crouchland Biogas LtdNon-operational; long-running planning/enforcement dispute, plant not producing. Out of analytical scope. | 10,512,000 m³ a year | 2 Feb 2015 |
| Grindley Biogas LimitedCompanies House DISSOLVED (Grindley Biogas Limited, 09931962). Not in GGCS. Plant defunct; excluded. | 3,942,000 m³ a year | 13 Dec 2016 |
| Solent Biogas LimitedSolent Biogas Limited is dissolved; no operating plant behind the accreditation. (The active "Solent Cluster" is a separate cross-sector decarbonisation initiative, not this entity.) Out of scope. | 3,942,000 m³ a year | 28 Apr 2017 |
| Chalkdock Biogas LimitedCompanies House IN LIQUIDATION (Chalkdock Biogas Limited, 10103843). Not in GGCS. Plant failing/defunct; excluded. | 3,942,000 m³ a year | 28 Apr 2017 |
| South Downs Farm Energy LimitedSouth Downs Farm Energy Limited (10103614) entered creditors' voluntary liquidation; plant not operating. Out of analytical scope. | 1,576,800 m³ a year | 28 Apr 2017 |
Holds an NDRHI accreditation but is not yet a live producer in our terms. Tracked as pipeline, kept out of the operating-asset analysis.
Reason given for most rows: NDRHI-accredited but not a live producer in our terms; flagged as pipeline / pre-commissioning.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Bridge Lake Biogas Limited | 3,153,600 m³ a year | 1 Jun 2021 |
| Farlington Biogas Limited | 3,153,600 m³ a year | 1 Jun 2021 |
| Angus Biogas Limited | 4,336,200 m³ a year | 1 Jun 2021 |
| Fife Biogas Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Marhamchurch Renewable Energy | 3,942,000 m³ a year | 1 Jun 2021 |
| South Manchester Energy Limited | 3,942,000 m³ a year | 31 Aug 2021 |
| Southwold Energy Limited | 5,518,800 m³ a year | 28 Sept 2021 |
Special-purpose vehicles that took a provisional accreditation on a single date but have no operating plant behind them. Listed here in full for completeness; excluded from the fleet.
Reason given for most rows: Acorn Bioenergy SPV shell company; provisional NDRHI accreditation 01/06/2021, plant not yet built. Excluded from operating-asset analysis; listed on /scope.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Lompoc Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Pindos Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Chopard Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Abronia Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Azores Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Finfoot Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Flores Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Florican Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Javan Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Jerdon Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Junin Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Kagu Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Maleo Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Nahan Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Andros Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Cantor Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Celestus Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Comoro Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Jolo Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Matuda Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Mona Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Round Island Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Wattle Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Epiros Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Gomera Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Jagos Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Karpathos Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Laricis Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Luzon Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
| Zarceus Energy Limited | 3,942,000 m³ a year | 1 Jun 2021 |
An opaque Ofgem label or an accreditation we have not yet resolved one to one to a specific, verified plant. These are operating plants: the operator-level rows are counted as injecting in the load-factor calibration behind the output estimates, but are not guessed into the plant register.
Reason given for most rows: Operator-level accreditation for a multi-plant operator; the 01343 and 01154 disclosures give no site-level name to pin it to one plant. Held out until site-level data is available.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Severn Trent Water Ltd | 6,576,000 m³ a year | 28 Feb 2015 |
| SEGLTD2Opaque Ofgem label "SEGLTD2"; no matching Companies House entity found. Accreditation 30/10/2015, 7,008,000 m3/yr. Held out until identified. | 7,008,000 m³ a year | 30 Oct 2015 |
| Biogas Ops 2"Biogas Ops 2" accreditation dates to 31/03/2016; the only Companies House match (Biogas Ops 2 Limited, 16052198) was incorporated 31/10/2024 and cannot hold a 2016 accreditation. Identity unresolved; held out. | 4,204,800 m³ a year | 31 Mar 2016 |
| AIR LIQUIDE UK Ltd | 4,730,400 m³ a year | 30 Jun 2016 |
| Severn Trent Green Power Ltd | 4,161,000 m³ a year | 29 Nov 2016 |
| Severn Trent Green Power Ltd | 5,256,000 m³ a year | 27 Apr 2017 |
| Severn Trent Green Power Ltd | 7,647,480 m³ a year | 22 Jan 2018 |
| Severn Trent Water Ltd | 4,161,000 m³ a year | 22 Jan 2018 |
| Severn Trent Green Power Ltd | 3,942,000 m³ a year | 2 Aug 2018 |
| AIR LIQUIDE UK Ltd | 7,600,000 m³ a year | 2 Aug 2018 |
| AIR LIQUIDE UK Ltd | 7,332,120 m³ a year | 23 Aug 2018 |
| AIR LIQUIDE UK Ltd | 7,200,000 m³ a year | 30 Aug 2018 |
| AIR LIQUIDE UK Ltd | 7,600,000 m³ a year | 21 Dec 2018 |
| AIR LIQUIDE UK Ltd | 6,800,000 m³ a year | 31 Jan 2019 |
| Severn Trent Water Ltd | 9,460,800 m³ a year | 17 Dec 2019 |
| Severn Trent Water Ltd | 9,460,800 m³ a year | 17 Dec 2019 |
Register rows we hold back until evidence links them to gas injected in Scheme Year 14 (April 2024 to March 2025). They are left out of the load-factor calibration, and the plant's support scheme and subsidy end date show as not confirmed.
Reason given for most rows: Held: not shown to inject in Scheme Year 14 (no evidence of when it started injecting). Not used for the load-factor calibration, the support scheme or the subsidy end date until evidence. Ruling of 23 Nov 2026.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Purbrook Biogas Limited | 3,942,000 m³ a year | 19 Feb 2021 |
| Nelson Biogas Limited | 3,547,800 m³ a year | 19 Feb 2021 |
| Havant Biogas Limited | 3,547,800 m³ a year | 19 Feb 2021 |
| Thorney Biogas Limited | 3,942,000 m³ a year | 19 Feb 2021 |
| Gillman Biogas LimitedHeld: not shown to inject in Scheme Year 14 (the site opened in 2025). Not used for the load-factor calibration, the support scheme or the subsidy end date until evidence. Ruling of 23 Nov 2026. | 3,153,600 m³ a year | 1 Jun 2021 |
Real, NDRHI-accredited operating plants that our GGCS-sourced universe never saw (GGCS membership is voluntary; NDRHI accreditation is not). Reconciled in from the regulator register.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Biomethane Castle Eaton LtdBMI-162Confirmed real, Companies House active (Biomethane (Castle Eaton) Limited, 09512414). Has insolvency history; included with a distress note. | 3,659,490 m³ a year | 29 Feb 2016 |
| East Helscott Renewable Energy LimitedBMI-158Confirmed real, Companies House active, no insolvency (East Helscott Renewable Energy Limited, 10103216; feedstock arm 10282511). Included. | 3,942,000 m³ a year | 31 Mar 2017 |
| Penans Renewable EnergyBMI-160Confirmed real, Companies House active, no insolvency (Penans Renewable Energy Limited, 10222968). Included. | 3,942,000 m³ a year | 28 Apr 2017 |
| Saltaugh Grange RenewableBMI-159Confirmed real, Companies House active, no insolvency (Saltaugh Grange Renewable Energy Limited, 10222907). Included. | 3,942,000 m³ a year | 28 Apr 2017 |
| High Hedley Biogas LimitedBMI-163Confirmed real, Companies House active but has insolvency history (High Hedley Biogas Limited, 06298101). Dormant; included and marked as dormant. | 2,496,600 m³ a year | 24 Aug 2018 |
| Trinity Hall AD LtdBMI-161Confirmed real, Companies House active, no insolvency (Trinity Hall AD Limited, 11501270). Included. | 4,425,000 m³ a year | 5 Feb 2020 |
An Ofgem entry that is the same physical site as a plant we already track, now cross-linked.
| Installation | Approved capacity | Earliest approval |
|---|---|---|
| Devon Green Power LimitedBMI-128Devon Green Power Ltd = Willand Biogas site (BMI-128); confirmed. Owned by Acorn/Qualitas. | 17,739,000 m³ a year | 28 May 2016 |
| Air Liquide Advanced Business And Technologies UKBMI-003By elimination: Air Liquide AB&T (CH 08676392) operates only BMI-003 & BMI-004; row 88 -> BMI-004, so row 167 -> BMI-003. | 5,466,240 m³ a year | 24 Sept 2020 |
| Thames Water Utilities LtdBMI-111Date-unique: Thames Water approval 27/01/2022 can only be BMI-111 (Deephams, comm 2021); BMI-112 (Mogden) commissioned 2024. | 6,175,800 m³ a year | 27 Jan 2022 |
Most projects are in Scotland (15), East Midlands (14), North West (11). Stated capacity totals 87.95 MW across the 20 of 76 projects that give one.
Site names are shown verbatim from the DESNZ Renewable Energy Planning Database (REPD). Spelling artefacts (for example “Aerobic Digestion Facility” where the register meant Anaerobic) come from the source and are kept so each row can be checked against REPD by its exact name.
| Site | Region | Capacity | Status | Source |
|---|---|---|---|---|
| Academy Road - Energy Centre & Anaerobic Digestion Facility | Scotland | 4 MW | Planning Permission Granted | REPD |
| Acorn Bioenergy Limited - Anaerobic Digestion Facility | South East | - | Planning Application Submitted | REPD |
| Allanfearn, Inverness - Anaerobic Digesters | Scotland | - | Planning Permission Granted | REPD |
| Alton Materials Recovery Facility - Anaerobic Digestion Facility | South East | 1.5 MW | Planning Application Submitted | REPD |
| Anaerobic Digester Development in Crumlin | Northern Ireland | 0.5 MW | Planning Application Submitted | REPD |
| Ashton Road, Ashton Keynes - Anaerobic Digestion Facility | South West | - | Planning Permission Granted | REPD |
| Balmcassie Commercial Park - Anaerobic digestion plant | Scotland | 3.5 MW | Under Construction | REPD |
| Barff Lane - Farm Anaerobic Digestion Plant | East Midlands | - | Under Construction | REPD |
| Barrow Clump Farm, Elveden - Anaerobic Digestion Plant | Eastern | - | Planning Application Submitted | REPD |
| Beckside, Sile croft - Anaerobic Digester Plants | North West | - | Planning Application Submitted | REPD |
| Beckworth Emporiun Anaerobic Digester Plant | East Midlands | - | Planning Application Submitted | REPD |
| Bicester Road, Long Crendon - Anaerobic Digestion Facility | South East | - | Planning Application Submitted | REPD |
| Biogen Merevale, Merevale Lane - Anaerobic Digestion Facility | West Midlands | - | Planning Application Submitted | REPD |
| Brae of Pert Farm - Anaerobic Digestion Plant | Scotland | - | Planning Permission Granted | REPD |
| Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant | South East | - | Under Construction | REPD |
| Carlindean Farm, Carnwath - Anaerobic Digestion Plant | Scotland | - | Planning Permission Granted | REPD |
| Cashmere Works, Birksland Street - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Permission Granted | REPD |
| Coleshill Sewage Treatment Works Anaerobic Digestion Facility | West Midlands | 2.4 MW | Planning Application Submitted | REPD |
| Cowdown Farm, Cowdown Lane - Anaerobic Digestion Facility | South East | - | Planning Permission Granted | REPD |
| Cross Lane, Glentham 2 - Anaerobic Digestion Facility | East Midlands | - | Planning Application Submitted | REPD |
| Del Monte UK, Weasenham Lane - Anaerobic Digestion Plant | Eastern | - | Planning Application Submitted | REPD |
| Dobcross Hall, Gaitsgill - Anaerobic Digester | North West | - | Planning Application Submitted | REPD |
| East Lodge Farm, Quinton Road - Anaerobic Digestion Facility | East Midlands | - | Under Construction | REPD |
| Eden Business Park, Edenhouse Drive - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Application Submitted | REPD |
| Ellington Road - Anaerobic Digestion Facility | North East | - | Planning Permission Granted | REPD |
| Fernbrook Bio Limited - Anaerobic Digestion Plant | East Midlands | - | Planning Application Submitted | REPD |
| Former Christian Salvesen, Burton Lane - Anaerobic Digestion Plant | East Midlands | 5 MW | Planning Permission Granted | REPD |
| Girvan Distillery, Bridge Mill Girvan - Anaerobic Digestion Extension | Scotland | 10 MW | Planning Permission Granted | REPD |
| Girvan Distillery, Main Street - Anaerobic Digestion Facility | Scotland | 2 MW | Planning Permission Granted | REPD |
| GMT Biogas - Anaerobic Digestion Facility, Cross Banks Road | Eastern | 1 MW | Planning Permission Granted | REPD |
| Grange Farm, Lea Lane, Aldford - Anaerobic Digestion Facility | North West | - | Planning Permission Granted | REPD |
| Great Hele Barton, Condate Biogas - Anaerobic Digestion Plant Expansion | South West | - | Planning permission granted | REPD |
| Greaves, Popplemire Lane - Anaerobic Digestion Plant | North West | - | Planning Permission Granted | REPD |
| Heck Hall Farm - Anaerobic Digestion Plant | Yorkshire and Humber | - | Planning Permission Granted | REPD |
| Hemswell Biogas, Hemswell Cliff Industrial Estate - Anaerobic Digestion | East Midlands | 6 MW | Planning Permission Granted | REPD |
| Hulam Farm, Hutton Henry - Anaerobic Digestion Plant | North East | - | Planning Permission Granted | REPD |
| Iggesund Paperboard, Siddick - Anaerobic Digestion Plant | North West | - | Planning Permission Granted | REPD |
| Iretons Way Anaerobic Digester Plant Extension | Eastern | - | Planning Permission Granted | REPD |
| Kilchoman Distillery, Bruichladdich - Anaerobic Digester Facility | Scotland | - | Planning Application Submitted | REPD |
| Lockerbie Creamery - Anaerobic Digester | Scotland | - | Planning Permission Granted | REPD |
| Lords Meadow Industrial Estate - Anaerobic Digestion Plant | South West | - | Under Construction | REPD |
| Manby Airfield, Manby Park - Anaerobic Digestor | East Midlands | - | Planning Permission Granted | REPD |
| Manor Farm, Lower Lane - Anaerobic Digestion Facility | North West | - | Planning Permission Granted | REPD |
| Market Weighton Road, Barlby - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Permission Granted | REPD |
| Naylor Farms, Rangell Gate - Anaerobic Digestor Plant | East Midlands | - | Planning Permission Granted | REPD |
| Naylor Farms, Spalding - Anaerobic Digestor Plant & Building | East Midlands | - | Planning Application Submitted | REPD |
| Old Green Farm, Earthcott Road - Anaerobic Digester | South West | - | Planning Application Submitted | REPD |
| Old Quarry Road, Westfield - Renewable Biogas Facility | Scotland | - | Planning Permission Granted | REPD |
| Ottringham Road, Keyingham - Anaerobic Digestion Facility | Yorkshire and Humber | 7 MW | Planning Permission Granted | REPD |
| Park Grounds Farm, Callow Hill - Anaerobic Digestion Facility | South West | - | Planning Application Submitted | REPD |
| Pennans Farm, Grampound - Anaerobic Digestion Facility | South West | - | Planning Application Submitted | REPD |
| Plusterwine Biogas, Station Road - Anaerobic Digestion Plant Extension | South West | - | Planning Permission Granted | REPD |
| Portgordon - Anaerobic Digestion Tanks | Scotland | - | Under Construction | REPD |
| Primrose Hill Farm, Smeaton Road - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Permission Granted | REPD |
| Rectory Farm - Anaerobic Digestion Plant | East Midlands | 7 MW | Planning Permission Granted | REPD |
| Reydon Ad Plant - Anaerobic Digestion Facility | Eastern | - | Planning Permission Granted | REPD |
| Roundhill - Food Waste Anaerobic Digestion Plant | West Midlands | - | Planning Application Submitted | REPD |
| Sandhutton Biofuel Plant, Thirsk - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Application Submitted | REPD |
| Sewstern Road - Anaerobic Digestion Facility | East Midlands | - | Planning Application Submitted | REPD |
| Singleton Birch, Melton Ross - Anaerobic Digestion Facility | Yorkshire and Humber | - | Planning Permission Granted | REPD |
| Stanley Villa Farm, Back Lane - Anaerobic Digestion Plant | North West | - | Planning Permission Granted | REPD |
| Staples Vegetables Limited, Station Farm - Anaerobic Digestion Plant | East Midlands | - | Planning Permission Granted | REPD |
| Streetly Hall Farm, West Wickham - Anaerobic Digestion Renewable Energy Facility | Eastern | 7 MW | Planning Permission Granted | REPD |
| Suezlower, Eccleshill Road - Anaerobic Digestion Facility | North West | - | Planning Permission Granted | REPD |
| Surfleet Bank & Woad Farm - Anaerobic Digestor Plant | East Midlands | - | Planning Permission Granted | REPD |
| The Drove, Pondersbridge - Anaerobic Digestion Plant | Eastern | 6.8 MW | Planning Permission Granted | REPD |
| The Portgordon Maltings, Phase 2 - Aerobic Digestion Facility | Scotland | 4 MW | Planning Permission Granted | REPD |
| The Portgordon Maltings, Phase 3 - Aerobic Digestion Facility | Scotland | 4 MW | Planning Permission Granted | REPD |
| The Portgordon Maltings. Phase 1 - Aerobic Digestion Facility | Scotland | 4 MW | Planning Permission Granted | REPD |
| The Seaboard Villages, Fearn Airfield - Anaerobic Digestion Plant | Scotland | 11 MW | Appeal Granted | REPD |
| Trinity Organics Limited - Anaerobic Digestion Plant | North West | - | Planning Permission Granted | REPD |
| Tubbs End, Tysoe Road - Anaerobic Digestion Facility | West Midlands | - | Planning Application Submitted | REPD |
| Wessex Farm, Sherborne Causeway - Anaerobic Digestion Facility | South West | - | Planning Application Submitted | REPD |
| Wigan Lane - Anaerobic Digester Unit | North West | - | Appeal Granted | REPD |
| Winwick Link Road, Winwick - Anaerobic Digestion Facility | North West | 1 MW | Planning Application Submitted | REPD |
| Ystym Colwyn Farms - Anaerobic Digestion Plant | Wales | 0.25 MW | Planning Permission Granted | REPD |
Can a new plant get GGSS support? Ofgem checks every tariff guarantee application against an annual budget cap for each year the plant would be paid. As of 5 October 2026, Ofgem reports that the cap has been reached and is running a queue: 16 applications are waiting. The tightest year is 2029-30, with £1.3m of budget left against £112.8m queued. Queued applications are processed in order if budget is released, through withdrawals, rejections or a higher cap set by the Secretary of State. Budget 2026 said that until a Cost Control Framework is in place at the 2027 spending review, no further policy costs will be placed on bills unless they bring bills down or are essential for security of supply; it did not say what this means for the GGSS cap (policy tracker).
The dark vertical line marks the cap.
Source: Ofgem, Green Gas Support Scheme applicants page, figures as of 5 October 2026. Retrieved 23 Nov 2026. Ofgem says the information "is subject to change based on ongoing queue movement and should not be used for the purpose of making commercial decisions; it is for information only" and that the figures "are indicative and may be subject to change on a daily basis". Ofgem page
The tightest year is our reading of Ofgem's figures, not an Ofgem statement. The Application Budget cap is distinct from GGSS spend.
GGSS is paid for by the Green Gas Levy on gas suppliers. Each December DESNZ sets the levy to fund the year's Overall Scheme Expenditure Budget, which sits above the application cap to leave headroom. Money collected but not yet paid out is carried forward and lowers later levy rates.
* 2025-26: Ofgem's main text and quarterly table state £59.4m collected; its statutory appendix states £69.4m for the same period. We show the first and note the second.
| Scheme year | Levy (p/meter/day) | Cap | Envelope | Collected | Paid to plants | Paid as reported in | Note |
|---|---|---|---|---|---|---|---|
| 2026-27 | 1.046 | £124.9m | £134.2m | not yet reported | not yet reported | - | Caps set 17 December 2025. Levy notice SB GBP 134,234,797. Levy collected and payments not yet reported (next Ofgem annual report expected about July 2027). |
| 2025-26 | 0.821 | £80.3m | £86.3m | £59.4m (appendix £69.4m) | £13.6m | 2025-26 | Caps set 20 December 2024 (GOV.UK slug says 2024-2025 but the page is the 2025-26 caps). Levy notice SB GBP 86,316,999. Ofgem 2025-26 report states two levy collected figures: GBP 59,375,604.41 in its main text and Fig 4.1, and GBP 69,419,214.21 in its statutory appendix (reg 65(4)(e)) for 1 April 2025 to 31 March 2026. Both stored. Paid GBP 13,576,081.35 (Fig 3.1). |
| 2024-25 | 0.105 | £51.7m | £54.6m | £10.0m | £22.9m | 2025-26 | Caps set 22 December 2023 (GOV.UK slug ends 2024-2025--2). Levy notice SB GBP 54,615,635. Collected GBP 9,975,157.41 (Ofgem 2024-25 report appendix). Paid GBP 22,882,885.77 as restated in the Ofgem 2025-26 report, Fig 3.1 (the 2024-25 report gave a lower figure). |
| 2023-24 | 0.122 | £32.9m | £37.8m | £21.3m | £3.0m | 2025-26 | Caps set 20/12/2022. Levy notice SB GBP 37,832,570. Collected GBP 21,317,343.56 (Ofgem 2023-24 report appendix). Paid GBP 2,980,181.32 as restated in the Ofgem 2025-26 report, Fig 3.1. |
| 2022-23 | 0.576 | £37.0m | £42.0m | £54.0m | £0.6m | 2025-26 | Archived page: levy rate and budget caps from UK Government Web Archive copies of withdrawn GOV.UK pages (caps flat across 2021-22 and 2022-23). Levy notice collection target (SB) GBP 39,900,000. Collected GBP 53,953,882.28 to 31 March 2023 (Ofgem 2023-24 report appendix, reg 65(4)(e); also Ofgem 2022-23 report). Levy is collected a quarter in arrears, so this includes 2021-22 obligations and exceeds the year's OSEB. Paid GBP 557,947.81 as restated in the Ofgem 2025-26 report, Fig 3.1. |
| 2021-22 | 0.484 | £37.0m | £42.0m | not yet reported | £0 | 2025-26 | Archived page: levy rate (notice updated 21 December 2021) and budget caps (Table 4, set 29/11/2021, extended 20/7/2022) from UK Government Web Archive copies of withdrawn GOV.UK pages. Scheme year 1 ran from 30 November 2021. The first two caps were set flat across 2021-22 and 2022-23. Levy notice collection target (SB) GBP 12,075,000. Levy collected: Ofgem states N/A, first levy payments May 2022. Paid: GBP 0 (Ofgem 2025-26 report, Fig 3.1). |
Levy envelope: the Overall Scheme Expenditure Budget (DESNZ budget caps, set each December). Levy collected and paid to plants: Ofgem GGSS annual reports, by scheme year from 1 April (the first ran from 30 November 2021); payment figures are as restated in the latest report and subject to change. Years not yet reported are left blank, never estimated. For 2021-22 and 2022-23 the first two budgets were set flat across both years, and levy is collected a quarter in arrears, so 2022-23 collections include 2021-22 obligations. DESNZ quarterly expenditure forecasts are the maximum possible spend of all tariff guarantees, not expected spend, and are not shown. Figures for 2021-22 and 2022-23 rely on archived copies of withdrawn GOV.UK pages.
Sources (Crown copyright): rate 1 · rate 2 · rate 3 · rate 4 · rate 5 · envelope 1 · envelope 2 · envelope 3 · envelope 4 · envelope 5 · collected 1 · collected 2 · collected 3 · paid
GGSS is the scheme that replaced the RHI for new biomethane plants (RHI closed to new entrants in 2021). It pays a tariff on injected biomethane for up to 15 years, ending no later than 31 March 2043.
Ofgem named the 14 registered participants in its response to our information request (EIR2026/01343, data correct as at 17 August 2026), and the plants it identified are in our fleet register. The table is the scheme-level view of those applications: each is shown by application number with Ofgem's application-stage estimates, and is not attached to a named plant on this page.
| Application | Expected injection | Max capacity (m³ a year) | Max capacity (GWh a year) |
|---|---|---|---|
| #1 | 31 Jan 2022 | 5,256,000 | 47.830 |
| #2 | 1 Jul 2024 | 9,636,000 | 87.688 |
| #3 | 1 Jun 2023 | 8,760,000 | 79.716 |
| #4 | 11 Jan 2023 | 9,198,000 | 83.702 |
| #5 | 1 Sept 2024 | 9,627,240 | 87.608 |
| #6 | 15 Sept 2023 | 8,760,000 | 79.716 |
| #7 | 1 Dec 2023 | 13,140,000 | 119.574 |
| #8 | 15 Jan 2024 | 13,140,000 | 119.574 |
| #9 | 5 Feb 2024 | 11,388,000 | 103.631 |
| #10 | 31 Mar 2024 | 13,140,000 | 119.574 |
| #11 | 14 Oct 2025 | 7,008,000 | 63.773 |
| #12 | 31 Oct 2024 | 6,570,000 | 59.787 |
| #13 | 1 Feb 2025 | 6,132,000 | 55.801 |
| #14 | 4 Aug 2025 | 5,694,000 | 51.815 |
Capacity converted to energy at the GGSS factor of 9.1 kWh/m³ (DESNZ). Figures are Ofgem's application-stage estimates, not metered output.
The green value of injected biomethane is sold as a certificate (an RGGO), usually through an offtake contract, and that contract is often the biggest driver of what a plant is worth.
Biomethane injected into the gas grid is physically indistinguishable from fossil gas once it is in the pipe. The green part is sold separately, as a certificate. For every unit of biomethane a producer injects, the Green Gas Certification Scheme issues a Renewable Gas Guarantee of Origin (RGGO), and it is the RGGO, not the molecule, that a supplier buys to sell a customer a “green gas” tariff, or that a corporate buys to back a carbon claim.
An offtake is the contract that moves that output: a producer agrees to sell its gas and/or its certificates to a counterparty, often for years at a time, and the price and length of that contract is usually the single biggest driver of what the plant is worth. A trader sits in between, buying certificates from producers and reselling them to suppliers and corporates.
The register below is the GGCS list of companies with green gas certificates available to sell: the trading and offtake counterparty universe. It is not a list of plants or assets for sale, and it must never be read as one. Where a name on it is also a producer or owner group we track, that is vertical integration: the same party making the gas and selling the certificates.
Almost all of this is inferred, not read from a contract: only 1 plant has a named buyer in a public announcement. Plants with a publicly evidenced route after subsidy ends: 1. Of all plants, 108 are on a subsidy scheme (NDRHI or GGSS), 1 on a corporate gas supply agreement, 0 sell at market prices and 27 are not determined. Subsidy is matched on support class and the Ofgem register, not checked plant by plant (method).
Soonest first. The earliest dates are a planning horizon, not a live emergency, like the subsidy end dates.
| Plant | Owner | Buyer (inferred) | Estimated renewal | Date is | Confidence |
|---|---|---|---|---|---|
| Moor Bio-Energy | 3i Infrastructure | AstraZeneca | Feb 2040 | Estimated | Likely |
The lender view. For now this covers only buyers named in a public offtake announcement.
| Buyer | Type | Plants |
|---|---|---|
| AstraZeneca | Corporate buyer | 1 |
Inferred from public signals: the GGCS sellers register, published offtake announcements and Companies House. Never a disclosure of contract terms or price. Certificate-market data derived from the Green Gas Certification Scheme is © Renewable Energy Assurance Limited and is not under the Open Government Licence.
Loading...
Subsidy and accreditation data on this page derives from the Ofgem NDRHI per-installation register and the Ofgem GGSS application data, both obtained under the Environmental Information Regulations and cited as “Ofgem NDRHI per-installation data as at Q3 2026” and “Ofgem GGSS application data as at 17 August 2026 (EIR2026/01343)”. Forward-pipeline rows come from the UK Government Renewable Energy Planning Database (REPD).
The sellers register is an exception. The certificate market section above is sourced from the Green Gas Certification Scheme “Green Gas - For Sale” register. GGCS data is © Renewable Energy Assurance Limited and is not under the Open Government Licence. The sellers list is shown to signed-in users only and is not offered as an export. Only the cross-reference against the tracked fleet, which runs on Companies House and public-register data, by company-name match, and is indicative only, carries the Open Government Licence attribution shown in the page footer.
Public registers contain errors, lags and gaps, and entity-to-asset matching is probabilistic in places. Verify any data point against its primary source before relying on it. Full method on the methodology page, full source list on the data sources page.
12 automated feeds: 8 up to date.
Spotted a plant we've miscategorised? Tell us · Contact · info@infravalue.co.uk