Skip to main content
InfraValue

R100 Energy Spaldington

East Yorkshire · owned by Hansa · UK biomethane plant

About this plant

Owned and run by AD operator BioteCH4 (group parent GVO B-1 Ltd) through R100 Energy Ltd, at Spaldington Airfield near Howden in East Yorkshire; it takes tankered organic waste. BioteCH4 already ran the digester and in October 2026 bought Air Liquide UK's upgrading unit with its gas and certificate contracts, so it now owns the whole plant. The GGCS register still lists Air Liquide UK as producer pending its update. Start date: not yet known, so no subsidy end year is shown. The Environment Agency permit (EPR/GP3439QK, issued to R100 Energy Ltd on 21 October 2019) says the plant will process up to 90,000 tonnes of waste a year to produce gas "primarily injected into the National Gas Grid for energy use via bio-methane upgrading plant and/or used in two CHP engines", and the upgrading unit is on the green gas certificate (GGCS) register, but we have found no public record of the first injection date.

Not confirmed

Subsidy ends (estimated)

49.607 GWh

Output a year, our estimatePublished

Not confirmed

Commissioned

Waste

Feedstock

Plant facts

Owner group
Hansa
Status
Operational
Output basis
Published design capacity x fleet load factor
Published figure
49.607 GWh a year (design) Source

See the full picture for free

A free account also shows you:

  • Lenders and secured charges, with Companies House filings
  • Filed accounts: net assets, cash and debt
  • The full timeline of deals, charges and subsidy dates
  • The ownership chain up to the ultimate parent
  • Signals such as insolvency notices and overdue filings, each with its source
  • A watchlist with alerts on the plants you follow

Free with an account. No card needed.