Sales of UK biomethane plants and stakes that a party to the deal announced publicly. Most do not publish a price, so the price is shown only where one was stated.
22 disclosed deals, 8 with a published price, 2 changes of control.
Top 8 buyers by number of disclosed deals. Each plant is counted once per buyer, even when it was bought in stages; buyers that bought through a platform are grouped under the owner. "In the register" counts those that are biomethane plants on our register.
8 of 22 deals have a disclosed price. Counting each portfolio once at its latest price, 3 can be put per GWh a year: on the output a party stated (solid dot) and, where every plant in the deal is on our register, on our own output estimate (hollow dot, indicative only). Figures are GBP m per GWh a year.
£0.40m per GWh a year on stated output, a reference point from 1 disclosed portfolio. Fewer than three portfolios, so this is a reference point, not a market band. A per-GWh multiple also ignores how many subsidy years were left at the sale date.
Scale starts at £0.
Type of the ultimate buyer named in each deal. 2026 is a part year.
| Date | Buyer and seller | What changed hands | Capacity | Stake | Price | Per GWh a year | Source |
|---|---|---|---|---|---|---|---|
| Oct 2026 | BioteCH4 Group from Air Liquide UK | Five biogas upgrading units with their gas and certificate sales contracts (not the AD plants) | - | Not disclosed | Price not disclosedNot disclosed | -No price | Trade press Source |
| Oct 2026 | Future Biogas (3i Infrastructure) from Foresight Environmental Infrastructure | Remaining 49% of six gas-to-grid AD facilitiesPlants (6)Identified from the seller's annual report, not named in the announcement. | 333 GWh a year | 49% | Price £104m Equity and shareholder loans 7.5% above seller's 30 Jun 2026 carrying value Stake 49% · 333 GWh a year · £0.64m per GWh | £0.64mOutput basis333 GWh as stated by the buyer in Aug 2024; 2026 output not disclosed | RNS Source |
| Sept 2026 | Pinta Energy (ABIO Group, Asterion) from Generate Capital | Generate Upcycle UK: seven UK AD plantsPlants (3)Identified from the seller's annual report, not named in the announcement. | - | Not disclosed | Price not disclosedNot disclosed | -No price | Company release Source |
| Aug 2026 | Envar Composting Limited from Blaise Developments Limited and Eco V Investments Limited | BLAISE BIOGAS LIMITED Change of control | - | - | Not disclosed | - | Companies House |
| Mar 2026 | Pinta Energy (ABIO Group, Asterion) from Marubeni Corporation | Japan Environmental Development and Investment UK Ltd (Brains Farm, Wincanton) | - | Not disclosed | Price £23.28619m Not stated No stated output | -No stated output | Companies House Source |
| Mar 2026 | BioticNRG (Palisade Real Assets) Seller not disclosed | Evercreech Renewable Energy LtdPlants (1) | - | 100% | Price not disclosedNot disclosed Stake 100% | -No price | Trade press Source |
| Feb 2026 | Future Biogas (3i Infrastructure) Seller not disclosed | Burton Agnes Renewables LtdPlants (1) | 40 GWh a year | Not disclosed | Price not disclosedNot disclosed 40 GWh a year | -No price | Company release Source |
| Nov 2025 | EDL Energy Seller not disclosed | GWE Biogas Ltd (Sandhill)Plants (1) | - | Not disclosed | Price not disclosedNot disclosed | -No price | Company release Source |
| Oct 2025 | Kanadevia Inova Seller not disclosed | Wardley Biogas (Gateshead) and Lower Drayton Biogas, two anaerobic digestion plantsPlants (2) | - | 100% | Price not disclosedNot disclosed Stake 100% | -No price | Company release Source |
| Aug 2025 | EAG Bioenergy (Vesper Infrastructure) from The Rockscape Group Limited | Rockscape Energy: North Link Bioenergy Ltd, North LincolnshirePlants (1)Identified from the seller's annual report, not named in the announcement. | - | Not disclosed | Price not disclosedNot disclosed | -No price | Trade press Source |
| Apr 2025 | Equitix from Helios Energy Investments | Helios's 50% of Bio Capital (nine plants)Plants (2)Identified from the seller's annual report, not named in the announcement. | - | 50% | Price not disclosedNot disclosed Stake 50% | -No price | Trade press Source |
| Feb 2025 | Pinta Energy (ABIO Group, Asterion) from Swen Ift Uk Limited; Real Asset Wealth Ltd | Charlton Park Biogas LtdPlants (1) | - | Not disclosed | Price not disclosedNot disclosed | -No price | Companies House Source |
| Jan 2025 | Bio Capital (Equitix) Seller not disclosed | High Hedley Biogas (East Hedley Hope, County Durham)Plants (1) | - | Not disclosed | Price not disclosedNot disclosed | -No price | Company release Source |
| Jan 2025 | Kanadevia Inova from Iona Capital | Iona Capital + 11 operational UK renewable gas plants | - | 100% | Price not disclosedNot disclosed Stake 100% | -No price | Company release Source |
| Sept 2024 | RWE Energy Transition Investments from 3i Infrastructure | c.23% of 3i Infrastructure's holding in Future Biogas (platform, partly primary) | - | Not disclosed | Price £35m Not stated 15% above seller's 31 Mar 2024 carrying value No stated output | -No stated output | RNS Source |
| Aug 2024 | Future Biogas (3i Infrastructure) from JLEN Environmental Assets Group (now Foresight Environmental Infrastructure) | 51% of six gas-to-grid AD facilitiesPlants (6)Identified from the seller's annual report, not named in the announcement. | 333 GWh a year | 51% | Price £68.1m Equity and shareholder loans At seller's 30 Jun 2024 carrying value Stake 51% · 333 GWh a year · £0.40m per GWh | £0.40mOutput basis333 GWh combined gas output as stated by the buyer, Aug 2024 | Company release Source |
| Jun 2024 | BioticNRG (Palisade Real Assets) Seller not disclosed | ADAP (Ad Aggregator Platform): six AD plants incl. four gas-to-grid, plus Material Change Ltd (MCL)Plants (4)Identified from the seller's annual report, not named in the announcement. | - | 100% | Price £66.17m Not stated Stake 100% · No stated output | -No stated output | Trade press Source |
| Feb 2024 | Engie Renewable Gases UK Ltd from Private members of the LLP | RAINBARROW FARM AD LLP Change of control | - | - | Not disclosed | - | Companies House |
| Dec 2023 | JLEN Environmental Assets Group (now Foresight Environmental Infrastructure) Seller not disclosed | Remaining 30% of Bio Collectors Holdings Ltd | - | 30% | Price £8m Not stated Stake 30% · No stated output | -No stated output | RNS Source |
| Sept 2023 | ENGIE UK from Downing LLP (registered holder Bagnall Energy Limited) | Ixora Energy Ltd (now Engie Renewable Gases UK Ltd, 10895324): three plants in Devon and SomersetPlants (3)Identified from the seller's annual report, not named in the announcement. | 160 GWh a year | 100% | Price £64.8m Not stated Stake 100% · 160 GWh a year · Basis unconfirmed | -Basis unconfirmed | Company release Source |
| May 2021 | Macquarie Capital (Adapt Biogas) Seller not disclosed | Majority stake in Evercreech Renewable Energy Ltd (greenfield)Plants (1) | - | Not disclosed | Price not disclosedNot disclosed | -No price | Trade press Source |
| Apr 2021 | Storengy UK (ENGIE) Seller not disclosed | Deal Farm Biogas, Norwich (pre-construction at acquisition) | 55 GWh a year | Not disclosed | Price not disclosedNot disclosed 55 GWh a year | -No price | Trade press Source |
| Dec 2019 | JLEN Environmental Assets Group (now Foresight Environmental Infrastructure) Seller not disclosed | 70% of Bio Collectors Holdings Ltd (food-waste AD, Mitcham, London) | - | 70% | Price not disclosedNot disclosed Stake 70% | -No price | Trade press Source |
| Aug 2019 | JLEN Environmental Assets Group (now Foresight Environmental Infrastructure) from EIS funds managed by Amersham Investment Management; Future Biogas (minority) | Warren Power Ltd (Warren Energy AD plant, Methwold, Norfolk)Plants (1) | - | 100% | Price £14.8m Not stated Stake 100% · No stated output | -No stated output | Trade press Source |
A change of control is a change of the controlling person at Companies House; it may be a sale or a reorganisation.
Article date 28 Oct 2026; buyer says completed. Units at Hemswell Biogas, Local Generation, Thornfield Energy, Holme Bioenergy and R100 Energy. Upgrading equipment and offtake contracts only; plant companies unchanged. Terms not disclosed.
RNS 3289A. Agreement signed; completion not stated. 100% figure is pro-rata (104.0/0.49) and the buyer already held 51%. Seller reports no gearing on AD at 31 Mar 2026, so this approximates EV only if the portfolio was ungeared at signing (not disclosed). Per-GWh uses the Aug-2024 output; 2026 output not disclosed. Completed: reported as acquired by Energy Global, 26 Oct 2026 (https://www.energyglobal.com/bioenergy/26102026/future-biogas-acquires-remaining-stake-in-six-anaerobic-digestion-facilities/). A buy-out of the remaining stake by the owner that already had control; shown beside the Aug 2024 control sale, not used as the reference.
Seller announced 21 Sep 2026; buyer post 28 Sep 2026 says acquired (completed). Price not disclosed. Plants not named; three matched from the register (Generate UK Investment Holdings chain). The other four are not matched. Register not yet showing Pinta above these plant companies as of 13 Nov 2026.
Completion proxy: Pinta Bidco Ltd notified as 75-100% PSC on 30 Mar 2026, the day Marubeni Corporation (75-100%) ceased. Buyer confirms the Brain's Farm acquisition "back in March". Price not disclosed. Price: Pinta Bidco Ltd (16159972) accounts to 31 Dec 2025, note 16 (https://find-and-update.company-information.service.gov.uk/company/16159972/filing-history/MzU1MTcxMjUxMWFkaXF6a2N4/document?format=pdf&download=0): "In March 2026, Pinta Bidco Ltd completed the acquisition of Japan Evironmental Development and Investment UK Limited and JEDI UK 2 Limited for a total consideration of GBP23,286,190 (equivalent to EUR26,915,783 at the date of acquisition)". Covers two companies; JEDI UK 2 Limited (16424759, incorporated 1 May 2025) is not matched to a plant in our register, so the figure may cover more than Brains Farm. Equity or EV and exact stake not stated.
Price not disclosed. Date is the trade-press date; the owner's own announcement may be earlier (not verified). Price: BioticNRG Ltd (14270833) accounts to 31 Dec 2024, post balance sheet events (second source link): "On 27 February 2026, the parent company acquired 100% of the share capital of Evercreech Renewable Energy Limited for an initial consideration of GBP1.4m and potential additional consideration of GBP4.4m." No headline price is recorded: the initial GBP 1.4m excludes up to GBP 4.4m contingent consideration. Completion 27 Feb 2026 (the date shown is the trade-press date).
Price and stake not disclosed. Seller not named in the release.
Price and stake not disclosed.
Two plants: Wardley (food waste, about 80,000 tonnes a year) and Lower Drayton (Thornfield 017). Seller not stated. Price not disclosed.
Article date 15 Aug 2025; Eag Bioenergy Ltd notified as 75-100% PSC of North Link Bioenergy on 12 Aug 2025, the day The Rockscape Group Limited ceased (completed). Price and exact stake not disclosed.
Article date 29 Apr 2025. Equitix became 100% shareholder; the two had held equal stakes since 2018. Price not disclosed; the plants were not named in the announcement. One plant (Energen Biogas) is linked through its Companies House ownership chain to Bio Capital and Equitix.
Completion proxy: Pinta Bidco Ltd notified as 75-100% PSC on 19 Feb 2025, the day both former PSCs ceased (Swen Ift Uk Limited 50-75%, Real Asset Wealth Ltd 25-50%). Buyer confirms "the Charlton Park Biogas acquisition in 2025". Exact stake within the 75-100% band and price not disclosed. Consideration stated in euros only: Demeter Holdco Ltd (15331061) consolidated accounts for 2025, note 29 (https://find-and-update.company-information.service.gov.uk/company/16159972/filing-history/MzU1MTcxMjQxNWFkaXF6a2N4/document?format=pdf&download=0): Pinta Bidco Limited acquired all the shares of Charlton Park Biogas Limited on 19 Feb 2025; "fair value of the consideration transferred ... amounted to EUR 4,391,121", cash. Not converted, so no GBP price is recorded. Equity or EV not stated; the plant's debt and a Pinta intercompany loan are separate.
"Acquired by Bio Capital in January 2025" (owner's site; news item dated 31 Jan 2025). Being refurbished; phase one restores biomethane injection. Price, stake and seller not stated.
Platform + 11-plant portfolio; consideration not disclosed. Activity comp for consolidation direction; no multiple derivable. Consideration stated in yen only: Kanadevia Corp securities report for the year to 31 Mar 2025 (https://www.kanadevia.com/newsroom/news/assets/pdf/FY2025-38.pdf), business combinations note: Iona Capital Ltd and 17 other group companies, 100% acquired for cash on 23 Dec 2024 by Kanadevia Inova UK Holdings; acquisition cost JPY 14,267 million including contingent consideration (goodwill JPY 3,259 million after final allocation). Not converted, so no GBP price is recorded. Covers the platform (11 plants, pipeline, team), not a plant comp.
3iN pre-close update RNS 1 Oct 2024; completed 27 Sep 2024. RWE invested GBP 35m: GBP 30m repaid 3iN RCF drawings, GBP 5m retained by Future Biogas for growth. Entry price a 15% premium to 3iN's 31 Mar 2024 valuation of Future Biogas. Stake is c.23% of 3iN's holding, not of the company, so the stake and the 100% figure are left blank. Platform-level (operator plus owned plants plus pipeline), not a plant comp.
Sold in line with the seller's 30 Jun 2024 carrying value: a carrying-value mark, not open-market price discovery. Plants identified from FGEN Annual Report FY26 (AD Holdco 1 Limited group), not named in the release.
Article date 17 Jun 2024. "Undisclosed sums"; sellers not named. Four gas-to-grid plants identified from the register: each sits under Ad Aggregator Platform Limited, whose holder is Bioticnrg Limited. The two CHP plants are not in our register. Price: BioticNRG Ltd (14270833) group accounts for the 16 months to 31 Dec 2024, note 29 (second source link): 100% of AD Aggregator Platform Limited acquired 25 Jul 2024, share consideration GBP 41,169,945 (total GBP 43,883,620 with GBP 2,713,675 directly attributable costs), and 100% of Material Change Ltd (MCL) for share consideration GBP 25,000,000 (total GBP 27,125,202 with GBP 1,725,202 costs and GBP 400,000 retained consideration). The price recorded is the two share considerations, GBP 66.17m, excluding deal costs and the retained amount. Up to GBP 1.6m further MCL consideration and an amount tied to a rateable value assessment are contingent and not included. Equity or EV not stated. Includes MCL, a services and feedstock business, so this is a portfolio price, not a per-plant price. Completion 25 Jul 2024 (the date shown is the 17 Jun 2024 announcement).
RNS 4 Dec 2023 (completed). "Total consideration of 8.0 million" for the remaining 30%, struck under a mechanism agreed at the Dec 2019 purchase, so not an open-market price. 100% figure is pro-rata (8.0/0.30). Bought from the existing minority owner (not named as a company). Not matched to an asset id in our register.
Announced 21 Sep 2023; Engie S.A. became 75-100% PSC of Ixora on 15 Sep 2023 (completed). Release: "secured for GBP 64.8 million"; equity vs EV not stated, and the price also bought Ixora's project pipeline, so the gross ratio 64.8 / 160 = 0.405 GBP m per GWh/yr is kept out of the price-per-GWh figures (and the market band) until the basis is confirmed. Stake 100%: acquisition of the company. Plants identified from the register: Condate, Gorst and Sustainable Energy Generation each have Ixora (10895324) as 75-100% PSC since 1 Nov 2019.
Article date 28 May 2021. Majority stake, percentage not stated; price not disclosed. Greenfield at the deal, grid injection expected early 2022. Same plant later sold to BioticNRG (deal of 20 Mar 2026).
Completed 8 Apr 2021 per the article (15 Apr 2021). Development-stage plant with a gas network connection planned; price and stake not disclosed. Not matched to an asset id in our register.
Announced 13 Dec 2019 (completed). Upfront payment plus conditional deferred amounts, values not disclosed. Bought from private individuals (not named). Plant predominantly injects biomethane to grid; not matched to an asset id in our register.
Announced 29 Aug 2019 (completed). Initial consideration GBP 14.8m including working capital, plus deferred payments of up to GBP 0.8m. Acquisition of the company, which owns 100% of Warren Energy Ltd. Plant later part of the six-plant portfolio sold to Future Biogas (listed separately); this entry prices Warren alone.
Seller-reported returns (Oct 2026). The seller reported a 12.9% IRR and 1.9x multiple on invested capital from first investment. That is the seller's realised return, not a discount rate.
How we normalise. 100% value = price / stake, pro-rata. Per GWh a year = 100% value / annual output, shown two ways and never blended: the output a party to the deal stated, and, as an indicative figure only, our own register output for the plants in the deal, used only where every plant in the deal is on our register. Where the two outputs differ, the per-GWh figures differ by the same ratio, which is why one deal can show two figures. The table column shows the stated-output figure only.
What cannot be derived. No party published EBITDA, so we do not show an EV/EBITDA multiple. We do not split a portfolio price across its plants, and we do not estimate a price where none was published.
Basis. A price for equity and shareholder loans equals enterprise value only if the plants carried no third-party debt. The seller reports no gearing on its AD investments; debt at the time of sale was not disclosed.
Repeat marks. The Aug 2024 and Oct 2026 prices are two marks on the same six plants. They count as one portfolio, not two independent comparables: the panel above shows the sale that transferred control (Aug 2024) and the later buy-out of the remaining stake beside it, not used.
The seller in the 2024 and 2026 sales values operating crop-fed AD at a 9.1% unlevered discount rate and food-waste AD at 9.9% (Annual Report, 31 March 2026). InfraValue's screen now uses the same two rates by feedstock, and 9.5% for mixed feedstock. The Oct 2026 price was 7.5% above the seller's carrying value. On our current model (20 Nov 2026), a 7.5% uplift on a plant with eight to ten years of support left corresponds to a discount rate about 2 points lower if the whole premium came from the rate: about 6.9% to 7.3% for crop-fed and 7.9% to 8.2% for food-waste plants (tariff windows from July 2015 to October 2016, 55 GWh a year, gas 3.0p to 3.5p/kWh). That is below the 1.5-point band our simulations sample around each default (7.6% to 10.6% crop-fed, 8.4% to 11.4% food waste). Part of the premium may instead reflect the buyer's control of the plants and recent earnings growth, so we keep the seller's own rates as the defaults and read the lower figures as a sign the simulated range may sit on the low side for plants like these. The two marks on this portfolio are £0.40m and £0.64m per GWh/yr of stated output (our own output estimate for the same plants gives a different, indicative figure; see the panel above); the screen uses £0.40m per GWh a year, the Aug 2024 sale of control, as a reference point from one portfolio (the completed Oct 2026 £0.64m is a buy-out by the controlling owner, shown as context, not used). These are screening benchmarks, not valuations of any plant. Methodology
Sources: company regulatory announcements (RNS), company press releases, Foresight Environmental Infrastructure Annual Report 2026, trade press.