Pretoria Energy is an independent operator in the UK biomethane sector, developing and running projects in Cambridgeshire. Its plants process a mix of feedstocks, primarily agricultural residues together with other organic waste streams. As an unaffiliated owner it contributes to the diversified supply of renewable gas in the region.

AI-written from register facts

Pretoria Energy holds 4 operating UK biomethane plants on the InfraValue register, with an estimated 234 GWh of biomethane a year. Feedstock: mixed and agricultural. Region: Cambridgeshire. Subsidy support ends between 2034 and 2039.

4
Plants
234
GWh a year (est.)
8y
Avg age
1 of 4
Subsidy ends by 2034

Plants

PlantSubsidy endsStatus
Pretoria Energy Chittering 22039Operational
Pretoria Energy Chittering2034Operational
Pretoria Energy Mepal 22039 (est.)Operational
Pretoria Energy Mepal2036Operational

Plant notes

  • Pretoria Energy Chittering 2 · Cambridgeshire

    A genuinely independent, owner-managed developer-operator, with ultimate control resting with the founder via Pretoria Energy Company Holdings Ltd rather than a fund or strategic; the company runs its plants in-house and is backed by bank debt rather than equity-fund ownership. The Chittering site on Chear Fen near Ely was the company's first AD plant, converting energy crops and agricultural feedstock from surrounding fen farmland into grid biomethane. One of the few sizeable independently held AD operators.

  • Pretoria Energy Chittering · Cambridgeshire

    A genuinely independent, owner-managed developer-operator, controlled by the founder via Pretoria Energy Company Holdings Ltd and backed by bank debt rather than equity-fund ownership; operations are in-house. This represents the expanded second-phase capacity at the Chear Fen, Chittering site, fed from the same surrounding Cambridgeshire fen farmland. Part of an independently held AD platform rather than fund-owned infrastructure.

  • Pretoria Energy Mepal 2 · Cambridgeshire

    Mepal 2 is the extension of Pretoria Energy's anaerobic digestion plant at Mepal, Cambridgeshire, run in-house by Pretoria Energy on bank debt rather than fund ownership and fed with agricultural feedstock from the surrounding fens. Start date: 2024, marked as an estimate. Pretoria Energy's own timeline (pretoriaenergy.com/about, read 16 November 2026) lists for 2024 "Commissioned and commenced full of the Mepal plant extension", after "the initiation of the second phase of the Mepal AD plant" in 2022-2023, and for 2025 "working on the commissioning of Mepal 3". A later planning statement reported by the Ely Standard described a second digester as reaching the end of commissioning, so the first gas date may be later than 2024. The Ofgem Green Gas Support Scheme register will confirm it; we will replace the estimate when it does.

Show all plant notes (4)
  • Pretoria Energy Mepal · Cambridgeshire

    A genuinely independent, owner-managed developer-operator, controlled by the founder via Pretoria Energy Company Holdings Ltd and run in-house on bank-debt funding. This represents the second-phase expansion capacity at the Mepal site, fed from the same fen farmland. Additional capacity within an independently held AD platform rather than fund-owned infrastructure.

Who to approach

Public-register routes to the people behind this group. InfraValue holds no private contact details.

Directors and officers on the public register

Plant companies (4)

Companies House and news figures are refreshed daily and Gazette notices weekly. Ofgem registers are loaded by hand when Ofgem publishes; their loads are dated on the data status page.

Sources: Green Gas Certification Scheme (not under the Open Government Licence), Companies House, Ofgem, The Gazette (Crown copyright).